高速铁路时速300km组合箱梁运架技术

On the Transporting and Erecting Techniques for the Combined Box Girder of the 300 km/h High-Speed Railways
下载PDF
导出
摘要 近年来在西南部山区修建高铁的项目越来越多,但是山区铁路桥隧比重高,整孔箱梁无法完整通过隧道,因此使用了大量的组合箱梁。设计中桥连隧的情况相当普遍,在洞内架设第一孔组合箱梁成了一个技术难题。结合贵广铁路施工实际,重点介绍了如何改进运架设备以及创新施工技术,来解决隧道零距离架梁这一难题,为山区铁路运架梁施工提供借鉴。 With more and more high-speed railway projects built in mountainous regions of Southwest China,and the bridge and the tunnel accounting for greater and greater part of the railway, a whole span of box girder as a whole often can not go through the tunnel,as a result of which a large number of composite girders are used. According to the design, it is fairly common that a bridge is directly linked to a tunnel, in which case the erection of the first span of the composite girder inside the tunnel be- comes a technical difficulty. With the practical construction of the Gui-Guang Railway as a practical example, how to improve the transporting and erecting equipment and other creative construction methods are introduced in detail in the paper, successful- ly solving the the difficulty of the 0-distance erection of girders inside a tunnel. The paper may serve as a useful reference for the beam-transporting-and-erecting construction of railways in mountainous regions.
作者 张振宇
出处 《国防交通工程与技术》 2013年第2期71-73,共3页 Traffic Engineering and Technology for National Defence
关键词 高速铁路 双线并置组合箱梁 运架措施 high-speed railway parallel-dual-lined combined box girder measures for transporting and erecting box girders
  • 相关文献

参考文献1

二级参考文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部