摘要
本文叙述了草林冲电站1#机组经过多次安装,由于受施工工艺水平及现场操作处理不当等因素影响,运行摆度、巴氏合金瓦温度持续增大.通过大修工作,查找原因,并进行了处理.
The operation throw and the temperature of Babbit alloy bush increase continously by the impact of the construction technology and site operation after the lth unit of Caolinchong Hydropower Station was installed. At last, the reason is analyzed and the treatment is done by overhauling the unit.
出处
《江西水利科技》
2013年第1期56-60,共5页
Jiangxi Hydraulic Science & Technology
关键词
水轮发电机组
摆度增大
瓦温升高
分析
Water-turbine generator set
Throw invreasing
Temperature of bush increasing
Reason analysis