高边坡锚索结构应力检测及锚固结构补强修复技术的应用

Application of Stress Examination and Reinforcement for High Side Slope Anchor
下载PDF
导出
摘要 长深高速公路(G25)K3457+744~+3458+144段(原梅河高速公路K140+400~+800)左侧边坡的锚索结构利用"锚固结构工后长期性能安全检测评估技术"检测发现预应力损失过大,当前锚索结构的工作性能已经远低于原设计要求的预应力状态。为此通过应力补偿技术对存在上述问题的锚索结构进行预应力补偿加固,使其恢复到原设计水平,确保边坡长期的整体稳定性,期望对类似工程有借鉴意义。 As too much prestressing losing of the anchorage structure at left side slope between K3457 + 744 and K3458 + 144 of Changshen Expressway (G25) has been detected by utilizing "long term safety evaluation technique of anchorage structure after construction", and the working performance of anchorage structure has been far below the required design prestressing conditions, all of the defects mentioned above have been treated by applying prestressing force compensation technology to resume to design level, so the overall stability of the slope can be assured, which has been expected to provide references for similar engineering projects.
作者 刘峰
出处 《广东公路交通》 2013年第1期51-53,57,共4页 Guangdong Highway Communications
关键词 高边坡 锚索 应力检测 补偿修复 high side slope, anchor cable, stress examination, stress compensation
  • 相关文献

参考文献4

  • 1建筑边坡工程技术规范,GB50330-2002[S].北京:中国建筑工业出版社,2002.
  • 2河龙高速公路高边坡预应力锚索结构工后工作状态检测报告[R].广东深圳:中铁西北科学研究院有限公司深圳南方分院.2009.
  • 3河龙高速公路高边坡预应力锚索结构工后工作状态检测报告[R].广东深圳:中铁西北科学研究院有限公司深圳南方分院,2010.
  • 4韩立军.岩土加固技术[M].徐州:中国矿业大学出版社,2005.