海河隧道沉管沉放对接的主要施工技术 被引量:20

Key Construction Technologies of Sinking and Docking of Immersed Tube of Haihe River Tunnel
下载PDF
导出
摘要 海河隧道工程采用沉管法工艺施工,在中国北方首次应用。通过沉放对接技术的应用,实现沉管管段在水中的精确对接,针对沉管的浮运、沉放、对接等关键问题进行重点分析与阐述,采用岸拖方式将沉管管段依次浮运至沉放区域;采用浮驳吊沉法工艺进行管段沉放;利用全站仪、GPS、倾角仪实时监控并调整管段空间位置及姿态;利用水力压接将GINA止水带压缩,完成沉管对接。施工结果表明,采用岸拖法浮运、浮驳吊沉法、水力压接技术进行沉管对接是成功的,技术上是可靠的。 The immersed tube method was used in the construction of Haihe River Tunnel, and it was the first time to be used in the north of China. By using the docking technologies, the accurate docking in water for immersed tube segment could be achieved. In this paper, some key issues are analyzed and described, such as the floating transportation, sinking and docking of the immersed tube and so on. By using the shore towing technique, the immersed tube segments were transported to the sinking area successively. By using the floating barge crane technique, the tube segments were put down to the water. By using total station device, GPS and inclinometer, the space position and gesture of the tube segments were real-timely monitored and adjusted. By using hydraulic pressure connecting technique, the GINA water-stops were compressed so that the docking of immersed tubes could be completed. The construction results show that by using the shore towing technique, floating barge crane technique and hydraulic pressure connecting technique, the docking of immersed tubes can be completed successfully and reliably.
作者 郭建文
出处 《铁道标准设计》 北大核心 2013年第4期73-77,共5页 Railway Standard Design
基金 中国铁建股份有限公司技术支持项目"软基条件下海河隧道沉管施工综合施工技术"(编号:09-03B)
关键词 沉管隧道 岸拖法 浮驳吊沉法 水力压接 施工 immersed tube tunnel shore towing technique floating barge crane technique hydraulic pressure connecting construction
  • 相关文献

参考文献9

二级参考文献22

  • 1吴小羊.上海市外环沉管隧道管段沉放施工技术[J].建筑施工,2005,27(2):29-31. 被引量:6
  • 2胡政才,先明其,马积薪.日本多摩川沉管隧道的设计与施工[J].世界隧道,1995(5):52-75. 被引量:14
  • 3GB50286-98堤防工程设计规范[S].北京:中国计划出版社,1998.
  • 4Jan Saveur, Walter C. Structural Design of Immersed Tunnels[J]. Tunneling and Underground Space Technology, 1993,8(2) : 123 - 133.
  • 5Menter F R. Two-Equation Eddy-Viscosity Turbulence Models for Engineering Applications[J]. AIAA Journal, 1994,32(8) :269 - 289.
  • 6王铎,程靳.理论力学[M].6版.北京:高等教育出版社,2002.
  • 7[2]The Tunnel, published by φresundsbro Konsortiet, May,2001.
  • 8杜云龙,刘千伟,王解先.常洪隧道管段浮运沉放测量及定位实时监控[C].城市交通隧道工程最新技术,2003,433-438.
  • 9蔡志明(译).水声建模与仿真[M].北京:电子工业出版社,2005.
  • 10聂美琳(译).京叶线台场隧道.世界沉管隧道技术,1998,:41-85.

共引文献92

同被引文献566

引证文献20

二级引证文献713

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部