摘要 以锦屏二级水电站引水隧洞工程为依托,对高地应力大断面软岩隧道的开挖技术进行探讨,认为开挖方法的选择、掌子面预支护的布置、弱爆破参数控制、相关监测技术的应用这4个方面是软岩隧道开挖必须重视的地方。锦屏引水隧洞软岩段的开挖,证明了在采用合理的掌子面预支护措施后,可以实现大断面(112 m2)开挖,其开挖进度比分块施工快,且施工组织方便灵活、成本也相对较低。 Excavation technologies of tunnel with high ground stress and large cross-section in soft rock are discussed in this paper, based on the diversion tunnel of Jinping- II hydroelectric station. The author thinks that when excavating the tunnel in soft rock, the four aspects must be paid attention to, including excavating methods, pre-supporting of working face, parameter control of weak blasting, and the utilization of relevant monitoring technology. The excavation at soft rock area of the diversion tunnel of Jinping-11 hydroelectric station has proved that: after using reasonable working face pre-supporting measures, the excavation of large cross-section (112 m2) can be achieved, with the faster excavation process than that of the piecewise excavation method and with the more convenient and more flexible construction organization, at a relatively low cost.
出处 《铁道标准设计》 北大核心 2013年第4期87-91,共5页 Railway Standard Design
基金 中央高校基本科研业务专项基金资助(SWJTU11ZT33) 教育部创新团队发展计划资助(IRT0955)
关键词 高地应力 软弱围岩 大断面隧道 掌子面预支护 弱爆破 信息化施工 high ground stress soft surrounding rocks tunnels with large cross-section pre-supporting of working face weak blasting informationized construction
  • 相关文献

参考文献11

二级参考文献27

共引文献80

同被引文献83

引证文献11

二级引证文献68

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部