网络优化技术在工程索赔管理中的应用 被引量:3

Application for network optimization technique in construction claim management
下载PDF
导出
摘要 在分析索赔的概念、内容基础之上 ,试图利用工期 -成本优化、工期 -资源优化的原理及方法 ,以两类典型的工程索赔问题为例 ,寻求运用网络优化技术解决工程索赔定量分析问题的途径 ,为确切计算索赔值。 On the basis of the contention and procedures of construction management, the autor discusses the network optimization principles and methods for construction time & cost and construction time & resources, with actual cost method , make an attempt at obtaining more rational claim funds and modified construction schedules by way of adopting the technique of network optimization in two typical construction claim problems,so as to provide basis and reference for construction enterprises.
作者 毛义华
出处 《浙江大学学报(自然科学版)》 CSCD 2000年第4期453-458,共6页
关键词 网络优化技术 工程索赔管理 应用 工程延期索赔 network optimization technique construction claim management application
  • 相关文献

参考文献3

共引文献2

同被引文献19

  • 1TURNER J R. The handbook of project-Based management [M]. London: McGraw-Hill, 1993.
  • 2KURTULUS I, DAVIS E W. Multi-project scheduling:Categorization of heuristic rules performance[J]. Management Science, 1982, 28(2): 161 - 172.
  • 3TSAI D M, CHIU H N. Two heuristics for scheduling multiple projects with resource constraints [J]. Construction Management and Economics, 1996, 14:325 -340.
  • 4SPRECHER A, KOLISCH R, DREXL A. Semi-active,active, and non-delay schedules for the resource-constrained project scheduling problem[J]. European Journal of Operational Research, 1995, 80: 94 - 102.
  • 5LI K Y, WILLIS R J. An iterative scheduling technique for resource-constrained project scheduling[J]. European Journal of Operational Research, 1992, 56: 370-379.
  • 6OZDAMAR L, ULUSOY G. A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis [J]. European Journal of Operational Research, 1996, 89: 400- 407.
  • 7TORMOS P,LOVA A. An efficient multi-pass heuristic for project scheduling with constrained resources[J].International Journal of Production Research, 2003, 41(5):1071-1086.
  • 8[1]TURNER J R.The handbook of project-Basod management[M].London:McGraw-Hill,1993.
  • 9[3]Bartusch M,M? bring R H,Radermacher F J.Scheduling Project Networks with Resource Constraints and Time Windows[J].Annals of Operations Research,1998,16:201-240.
  • 10[4]Blazewicz J,Lenstra J K,Rinnooy Kan A H G.Scheduling Subject to Resource Constraints:Classification and Complexity[J].Discrete Applied Mathematics,1983,(5):11-24.

引证文献3

二级引证文献58

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部