Assessment of Risk of TBM Jamming during Construction of Hydro Tunnel in Belgrade
Assessment of Risk of TBM Jamming during Construction of Hydro Tunnel in Belgrade
参考文献3
-
1M. Trickovic, Calculation of ground pressures on TBM for Belgrade tunnel "Visnjica", in: 1st International Congress on Tunnels and Underground Structures in South-East Europe "Using Underground Space", Dubrovnik, Croatia, Apr. 7-9, 2011, pp. 1-10.
-
2E. Hoek, Rock Engineering, Tunnels in weak Rock, course papers, 2003, available online at: http://www.RocScience.com.
-
3RocScience, Documentation and papers for Phase 2 software, available online at: http://www.RocScience.com.
-
1方东平,席海峰,王晓明,张传敏.Influences of Shrinkage,Creep,and Temperature on the Load Distributions in Reinforced Concrete Buildings During Construction[J].Tsinghua Science and Technology,2009,14(6):756-764. 被引量:2
-
2GuoTao Yang,ZaiTian Ke,DeGou Cai,HongYe Yan,JianPing Yao,Feng Chen.Investigation of monitoring system for high-speed railway subgrade frost heave[J].Research in Cold and Arid Regions,2015,7(5):528-533.
-
3Munishi Fred Abel,ZHANG Shengdong,LI Minying.Spatial Thermal Crack Control in Mass Concrete[J].结构工程师,2012,28(6):54-59.
-
4刘建华,刘晓明,张永杰,肖庭.Numerical analysis and field monitoring tests on shallow tunnels under weak surrounding rock[J].Journal of Central South University,2015,22(10):4056-4063. 被引量:2
-
5Morteza Abdi Cherlo,Hamid Hashemolhosseini,Masoud Cheraghi,Saeed Mahdevari.Feasibility evaluation for excavation of Naghshe Jahan Square subway station by underground methods[J].Journal of Rock Mechanics and Geotechnical Engineering,2013,5(6):452-459. 被引量:3