期刊文献+

Assessment of Risk of TBM Jamming during Construction of Hydro Tunnel in Belgrade

Assessment of Risk of TBM Jamming during Construction of Hydro Tunnel in Belgrade
下载PDF
导出
出处 《Journal of Civil Engineering and Architecture》 2012年第11期1551-1560,共10页 土木工程与建筑(英文版)
关键词 TBM 风险评估 工程建设期 水工隧洞 干扰 贝尔 数值计算方法 混凝土衬砌 Hydro tunnel, TBM shield, ground pressures, TBM jamming
  • 相关文献

参考文献3

  • 1M. Trickovic, Calculation of ground pressures on TBM for Belgrade tunnel "Visnjica", in: 1st International Congress on Tunnels and Underground Structures in South-East Europe "Using Underground Space", Dubrovnik, Croatia, Apr. 7-9, 2011, pp. 1-10.
  • 2E. Hoek, Rock Engineering, Tunnels in weak Rock, course papers, 2003, available online at: http://www.RocScience.com.
  • 3RocScience, Documentation and papers for Phase 2 software, available online at: http://www.RocScience.com.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部