基于失效模式分析理论提高电费实收销账完成率的研究 被引量:2

The Study on the Improvement of Electricity Paid-in Write-off Efficiency Based on the Theory of Failure Mode Analysis
下载PDF
导出
摘要 电费实收销账是电费回收的重要环节之一。以上海市电力公司供电服务中心为例,深入分析了其电费实收销账现状,确定了委托付款为影响及时销账的主要因素,并采用失效模式分析法,探索了委托付款销账的可改进点及改进方向,进而提出了具体措施和实施计划,并进行了全面的应用总结。实践证明,改进措施有助于提高委托付款销账率。 The Electricity paid-in write off is an important link of the tariff recovery. Taking the Tariff Management Department of Shanghai Municipal Electric Power Company as an example, this paper makes deep analysis on the present situation of its's electricity paid-in write off, determines that authorized payment is a main factor influencing the timely write off, and probes into some improvable points and improvement directions by using failure mode analysis, and further puts forward some specific measures and implementation plans, and makes comprehensive application summary. Practice has proved that the improvement measures are helofl to improve the write off rate of authorized payment.
出处 《山西科技》 2013年第2期48-51,共4页 Shanxi Science and Technology
关键词 电费实收 销账完成率 委托付款 失效模式分析 electricity charges paid-up completion rate of write-offs failure mode analysis authorized payment
  • 相关文献

参考文献11

二级参考文献34

  • 1韩富春,俞鑫祺,赵铭凯,赵庆生,陈崇浩,包立,王培利,张秀玲.城市配电系统可靠性评估方法研究[J].中国电力,1996,29(2):45-47. 被引量:15
  • 2张友福.浅析10kV配电线路供电可靠性[J].电工技术,2006(8):35-37. 被引量:21
  • 3[2]徐平.电控及自动化设备可靠性工程技术[M].北京:机械工业出版社,1998.
  • 4别朝红,王锡凡.配电系统的可靠性分析[J].中国电力,1997,30(5):10-13. 被引量:99
  • 5BILLINTON R, ALLAN R N. Reliability assessment of large electric power systems[M]. Boston:Kluwer Academic ic Publishers, 1988.
  • 6BILLINTON R, ALLAN R N. Reliability evaluation of power systems [ M ]. london : Pitman Advanced Publishing program, 1984.
  • 7BILLINTON R I WANG Peng. Teaching distribution system reliability evaluation using montecarlo simulation [J ]. IEEE Trans on Power Systems, 1999,14(2) :397-403.
  • 8GOEL L. Montecarlo simulation-based reliability studies of a distribution test system[J]. Electric Power Systems Research ,2000,54( 1 ) :55-65.
  • 9DODU J C,MERLIN A. An application of linear programming to the planning of large scale power systems [A]. Proc 5th PSCC [ C ]. Cambridge : [ s.n. ], 1975.76- 83.
  • 10AMHADYT N,EHSAN M. Evaluation of power systems reliability by an artificial neural network [J]. IEEE Trans on Power Systenm, 1999,14( 1 ):287-291.

共引文献84

同被引文献6

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部