摘要
黄韩侯铁路纵目沟特大桥5号承台的大体积混凝土施工,采取内掺高效减水剂和粉煤灰,并辅之以冷却水循环和温度监测等措施,取得了较好的经济技术效益。
In the construction of mass concrete for the No.5 cushion cap of Zongmugou Bridge on Huangling- Hancheng-Houma Railway, the measure of mixing with high-efficiency water reducing agent and pulverized fuel ash were adopted supplemented by cooling water circulation and temperature monitoring, and better economic and technical effects were achieved.
出处
《山西科技》
2013年第2期66-68,共3页
Shanxi Science and Technology
关键词
大体积混凝土
温度控制
温度监测
mass concrete
temperature control
temperature monitoring