摘要
针对PHC管桩锤击过程中会出现异常桩的现象,结合PHC管桩的特点及工程施工现场条件,介绍了管桩的锤击施工工序,并提出了处理异常桩的方法,对类似工程具有借鉴意义。
According to the abnormal pipe pile phenomenon appeared in PHC pipe pile hammer process,combining with the characters and construction site conditions of PHC pipe pile,introduced the hammer construction process of pipe pile,and put forward the method treatment of abnormal pile,provided reference for similar engineering.
出处
《山西建筑》
2013年第8期37-38,共2页
Shanxi Architecture
关键词
PHC管桩
异常桩
施工工序
处理方法
PHC pipe pile
abnormal pile
construction process
processing method