摘要
对天津北疆发电厂铁路专用线接轨方案进行了探讨,结合铁路线技术标准,对接轨方案作了详细的阐述,指出在企业专用线方案规划中,应满足主要货流的顺向接入条件,具备整列装卸、整列到发的技术条件,从而加快车辆周转,提高作业效率。
The thesis explores the rail-integrating scheme of Beijiang power plant railway special line in Tianjin.Combining with railway line technology criteria,it illustrates the rail-integrating scheme,and points out some suggestions,such as meeting major goods flow integration,possessing whole train loading and unloading and transportation,so as to speed up the vehicle utilization ratio and improve working efficiency.