摘要
结合山平高速公路项目施工经验,对2/8灰土挤密桩特殊路基处理段所使用的石灰稳定土以及所应用的原材料进行了试验分析,确定了所用稳定土的灰剂量曲线、最佳含水率、最大干密度,从而为选择合理的施工方案提供科学依据,以确保施工进度和工程质量。
Combining with the construction experience of Shanyin-Pinglu highway project,the paper carries out experimental analysis on lime-stabilized soil and raw material of 2/8 lime compacting pile at special subgrade section,and determines the lime amount curve of stabilized soil,optimal moisture and maximum dry density.As a result,it has provided scientific basis for selection rational construction scheme and has ensured construction schedule and engineering quality.
出处
《山西建筑》
2013年第8期193-194,共2页
Shanxi Architecture
关键词
石灰稳定土
标准试验
原材料
lime-stabilized soil
standard test
raw material