摘要
分析了景德镇地区既有、在建及规划铁路现状及存在的主要问题。根据地区客、货运量的需求,结合城市总体规划及总图规划,重点对九景衢铁路引入景德镇地区线路方案进行了两大系列的比选,通过经济技术比较,九景衢引入景德镇地区线路推荐南进北出方案。
Based on analyzing the major problems existing in the existing railway,under-construction railway and planning railway in Jingdezhen and according to the requirements of passenger volume and freight volume and,this paper focused on the analysis and selection of two series of route schemes about introducing Jiu-Jing-Qu railway into Jingdezhen combined with the city developing macro-plan.Through the economic and technical comparison,the scheme which the train route is travelling from south to north is recommended.
出处
《交通科技》
2013年第2期108-110,共3页
Transportation Science & Technology
关键词
铁路
线路
引入方案
railway
route
introduction scheme