论整体式模板在后张法预应力混凝土简支箱梁施工中的应用 被引量:3

On the Application of Integral Formwork to the Construction of Post-tensioned Prestressed Concrete Box Beam with Simple Support
下载PDF
导出
摘要 在后张法预应力混凝土简支箱梁的施工中,模板的外形尺寸、反拱及预留压缩量的控制尤为重要,中交四公局兴安制梁场在箱梁的预制过程中采用整体模板,文章结合现场施工,就模板在箱梁预制中的应用进行探讨。 In the constrnction of post-tensioned prestressed concrete box beam with simple support, the external dimension of formwork, inverted arch and the control of reserved compressed volume are particularly important. In the coupe of the prefab- rieation of box beams in Xin'an Beam Plant of CCCC Fourth Engineering Bureau, integral formwork is applied. Based on prac- tical experience on construction site, the paper explores the application of formwork to the prefabrication of box beam.
作者 黄煜武
出处 《企业科技与发展》 2013年第4期19-21,共3页 Sci-Tech & Development of Enterprise
关键词 整体式模板 反拱 预留压缩量 integral formwork: inverted arch: reserved compressed volume
  • 相关文献

参考文献2

  • 1中铁工程设计咨询集团有限公司.时速250公里客运专线铁路有砟轨道后张法预应力混凝土简支箱梁[Z].2008.
  • 2中铁四局集团有限公司.铁路后张法混凝土梁预制场建设技术指南[M].北京:中国铁道出版社,2009.

共引文献1

同被引文献15

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部