摘要
对胜利炼油厂高铁乳化沥青装置首次开工过程作了总结,对试生产产品存在的质量问题进行分析,及时落实改进措施,改进后的生产结果表明,胜炼可为京沪等高铁建设提供优良的高铁乳化沥青。
This article concluded the start- up processe of Shengli Refinery emulsified asphalt plant for the first time, analyzed the quality problems of product by pre - production and improved timely, the improved production results showed that Shengli Refinery could provide the high - quality high - speed railway emulsi- fied asphalt for the needs as the Jing - Hu high - speed railway construction
出处
《石油沥青》
2013年第2期48-50,共3页
Petroleum Asphalt
关键词
高速铁路乳化沥青胶体磨
high -speed railway
emulsified asphalt
colloid mill