摘要
简要介绍以著名的潮流模型 S2 1HD为基础 ,用新建的依赖于原观资料的全沙冲淤概化模型 ,对丹东电厂蓄水库设计方案进行的回淤计算 ;引述了相应的波浪模型试验结论和浪、流联合作用淤积预报结果。经过对库区开挖主要阶段施工资料的分析与验证得知
It was introduced in the paper on the basis of the famous tide model of S21HD, the sediment calulation for the design proposal of the Reservoir of Dandong Power Plant had been given by the newly setup generalized model of overall sediment which relying upon the data of original observation, and the relative wave model test conclusions and the forecast results of sediment by the joint action of wave and current were quoted. It was obtained through the analysis and verification of the construction data of the main step for reservoir excavation that the generalized model of sediment set up and the all the forecast results of sediment are successful.
出处
《港工技术》
北大核心
2000年第2期1-12,共12页
Port Engineering Technology
关键词
电厂蓄水库
冲淤概化模型
淤积预报
施工验证
reservoir of power plant
generalized model of sediment
sediment forecast
construction verificiation