摘要
就广州黄埔新港二期工程扶壁码头实例 ,对大型扶壁整体结构进行有限元分析 ,并对肋板、立板进行成果分析 。
The finite element analysis on the monolithic structure of large buttressed quay wall and the result analysis on ribbed slab and upright plate were given in the paper through the actual example of the Phase Two Project of Huangpu Xingang. The proposal of improving the reinforcement method for large buttressed quay wall was finally given in the paper.
出处
《港工技术》
北大核心
2000年第2期32-35,共4页
Port Engineering Technology
关键词
码头
扶壁整体结构
有限元分析
配筋改进方法
buttressed quay wall, finite element analysis, SAP5 program, reinforcement