临洪河大桥18号~22号深水墩施工技术

On construction technique of 18#~22# deep water pier at Linhong River Bridge
下载PDF
导出
摘要 结合连云港310国道宋跳立交至大酒壶段临洪河大桥水中墩施工和以往的施工经验,采用固定平台和套箱法施工,确保本桥处于汛期施工时,在满足池洪、环保等的前提下,尽量少压缩过水断面,完成了钻孔桩、系梁的施工。 Combining with the water pier construction at Linhong River Bridge between Songtiao Overpass and Dajiuhu Section along the 310th National Road in Lianyungang and the pervious construction experience of the company,the paper adopts the fixed platform and sleeve box method in the construction,and ensures less on cross-section of the river and accomplish the construction at the bored piles and binders with the premise of meeting the demands of the flood release and protecting the environment in the construction at the bridge during flood seasons.
作者 邬亚平
出处 《山西建筑》 2013年第12期139-141,共3页 Shanxi Architecture
关键词 固定平台 套箱法 深水墩 施工技术 fixed platform sleeve box method deep water pier construction technique
  • 相关文献

参考文献3

二级参考文献11

共引文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部