期刊文献+

高墩连续梁边跨直线段的技术探索 被引量:2

The technology exploration of high piers continuous beam side across linear segment
下载PDF
导出
摘要 以中南铁路工程湫水河特大桥为例,研究连续梁边跨直线段施工方案,采用了以挂篮施工直线段的新技术应用,该工程的成功实施,可为今后类似工程的设计和施工提供借鉴。 Taking Qiushui river super bridge in central south railway engineering as an example,this paper researched the construction scheme of continuous beam side across linear segment,used the new technology application in hanging basket construction linear segment,the successful implementation of this project,could provide reference for the design and construction of future similar projects.
作者 刘进宝
出处 《山西建筑》 2013年第12期155-156,共2页 Shanxi Architecture
关键词 连续梁 边跨直线段 挂篮施工 continuous beam side across linear segment hanging basket construction
  • 相关文献

参考文献3

  • 1LudomirUzarowski, Golder Associates Ltd, Michel Paradis, Min- isterc des Transports du Quebec, Quebec Paul Lum, Lafarge Canada Inc. Accelerated Performance Testing Of Canadian As- phalt Mixes Using Three Different Wheel Rut Testers [ R ]. Quebec City ,Quebec ,2004 :3-5.
  • 2何兆益.高模量沥青混凝土路面新结构及应用研究[D].重庆:重庆交通大学,2008.
  • 3郑健龙.重交通条件下高模量沥青混凝土路面材料设计与施工技术研究[D],长沙:长沙理工大学,2008.

共引文献1

同被引文献11

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部