摘要
从改进传统计划体系着手,借鉴国际上新兴的精益建造理论,改变传统计划体系中信息自上而下单向流动的方式,建立了工程项目总承包施工阶段精益计划体系,从而提高建筑企业的劳动生产率。
To begin with improving traditional planning system,through referring new international lean construction theory,the paper changes bottom-up single information flow method of traditional planning system,and establishes lean planning system of total engineering project contract at construction phase,so as to improve producing rate of building enterprises.
出处
《山西建筑》
2013年第12期234-235,共2页
Shanxi Architecture
关键词
工程项目总承包
精益计划
理论
total engineering project contract
lean planning
theory