介绍大源渡枢纽泄水闸弧形闸门安装调试和运行情况,对枢纽和闸站的总体布置,闸门的设计、制造和安装等进行总结,并提出看法和意见。
The situations of installation, adjustment and operation of the segment gate of Dayuandu Junction discharge sluice are introduced. The overall arrangement of the Junction and lock gate, the design, manufacture and installation of lock gate are summarized, and some views and opinions are expounded.
作者
李从众
刘瑜
LI Cong- zhong1;LIU Yu2 (1. Dayuandu Junction Dam& Power Station Workshop Building Engineering Supervision Station,Changsha 410007, China; 2. Hunan Xiangjiang Navigation Construction& Development Corporation, Ltd., Changsha 410005, China)
出处
《水运工程》
北大核心
2000年第10期68-73,共6页
Port & Waterway Engineering
关键词
大源渡枢纽
泄水闸
弧形闸门
设计
安装
运行
Dayuandu Junction
discharge sluice
segment gate
design
installation
operation