大源渡枢纽泄水闸弧形闸门的安装和运行 被引量:2

Installation and Operation of the Segment Gate of Dayuandu Junction Discharge Sluice
下载PDF
导出
摘要 介绍大源渡枢纽泄水闸弧形闸门安装调试和运行情况,对枢纽和闸站的总体布置,闸门的设计、制造和安装等进行总结,并提出看法和意见。 The situations of installation, adjustment and operation of the segment gate of Dayuandu Junction discharge sluice are introduced. The overall arrangement of the Junction and lock gate, the design, manufacture and installation of lock gate are summarized, and some views and opinions are expounded.
作者 李从众 刘瑜 LI Cong- zhong1;LIU Yu2 (1. Dayuandu Junction Dam& Power Station Workshop Building Engineering Supervision Station,Changsha 410007, China; 2. Hunan Xiangjiang Navigation Construction& Development Corporation, Ltd., Changsha 410005, China)
出处 《水运工程》 北大核心 2000年第10期68-73,共6页 Port & Waterway Engineering
关键词 大源渡枢纽 泄水闸 弧形闸门 设计 安装 运行 Dayuandu Junction discharge sluice segment gate design installation operation
  • 相关文献

同被引文献6

引证文献2

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部