介绍大源渡水电站采用的贯流式水轮机是根据模型和真机试验的结果确定采用的。
It is introduced that the tubular turbine was determined to be adopted in Dayuandu Hydropower Station through model test and real test.
作者
钟承钢
ZHONG Cheng-gang (Survey, Design and Research Institute for Water Power Engineering of Hunan Province under the Ministry of Water Resources,Changsha 410007, China)
出处
《水运工程》
北大核心
2000年第10期89-95,共7页
Port & Waterway Engineering
关键词
大源渡枢纽
水电站
水轮机
模型试验
真机试验
Dayuandu Junction
hydropower station
water turbine
model test
real test