横南线陈墩滑坡病害分析
摘要
针对横南线陈墩滑坡的发展过程、形态特征、形成原因等问题进行分析讨论。
出处
《路基工程》
2000年第3期19-21,共3页
Subgrade Engineering
参考文献3
-
1Sug-Woo Jung,Suk-Joong L. Kang,Dong-Kuk Kim,Sunghak Lee,Joon-Woong Noh. Effect of surface carburization on dynamic deformation and fracture of tungsten heavy alloys[J] 1999,Metallurgical and Materials Transactions A(8):2027~2035
-
2Heung-Sub Song,Joon-Woong Noh,Woon-Hyung Baek,Suk-Joong L. Kang,Byung-Sun Chun. Undulation of W/matrix interface by resintering of cyclically heat-treated W-Ni-Fe heavy alloys[J] 1997,Metallurgical and Materials Transactions A(2):485~489
-
3Joon-woong Noh,Moon-hee Hong,Geun-hong Kim,Suk-joong L. Kang,Duk yong Yoon. The cause of matrix penetration of W/W grain boundaries during heat treatment of W-Ni-Fe heavy alloy[J] 1994,Metallurgical and Materials Transactions A(12):2828~2831
-
1王本枢.横南线开通对鹰厦线中段通过能力影响的分析与建议[J].上海铁道科技,1998(4):10-11.
-
2刘宁.加筋土挡墙在铁路路基工程中的应用[J].工程科技,1999(1):45-50.
-
3王道声.横南线分流方案初探[J].上海铁道科技,1998(1):11-14.
-
4龚方.横南线DK111深长路堑施工[J].路基工程,2001(1):58-61.
-
5彭涛.分水关隧道照明设计[J].科学技术通讯,1999(3):28-30.
-
6陈炜.福州-上海快速旅客列车改走横南线的思考[J].上海铁道科技,2001(2):29-31.
-
7王志礼.横南线运营与建设前景纵横谈[J].铁道运输与经济,1999,21(7):24-26.
-
8王少果.粉砂土路基的防护方法[J].路基工程,2000(3):40-41.
-
9肖绍彬.提高山区铁路信号设备的防雷能力[J].铁路通信信号工程技术,2007,4(1):21-21. 被引量:2
-
10吴晓,周翠彩,金毅.提高金华火车东站编解能力的对策研究[J].交通科技,2010,20(6):72-75. 被引量:1