摘要
Al Hikma项目地处气候燥热的阿联酋迪拜,地上62层,总建筑高度284.88m,属于超高层项目,主体结构的梁、柱和核心筒大量使用了C70,C80高强混凝土。根据现场高强混凝土的施工及裂缝的出现,阐述了高强混凝土裂缝产生的原因,并根据美国规范重点论述了3种鉴定裂缝是否为结构裂缝的方案。
The Al Hikma project is located in the hot and dry area of Dubai,UAE.It has 62 levels aboveground with a total height of 284.88m,which belongs to super high-rise building.High-strength concrete of C70 and C80 are extensively used in beams,columns and core-walls.Based on high-strength concrete construction and occurrence of concrete cracks on site,this paper explains the reason for the occurrence of cracks in high-strength concrete,and discusses three kind of appraisal schemes to check if the cracks are structural cracks according to the American standards.
出处
《施工技术》
CAS
北大核心
2013年第6期17-20,共4页
Construction Technology
基金
中建股份科研项目资助(CSCEC-2011-C-04)
关键词
高层建筑
混凝土
高强混凝土
裂缝
鉴定
tall buildings
concrete
high strength concrete
cracks
appraisal