城市之光超高层建筑模板拆除技术 被引量:2

Formwork Removal for the City of Lights Super High-rise Building
下载PDF
导出
摘要 以City of Lights(以下简称COL)项目为例,介绍了模板拆除施工方案设计,优化与相关技术。有效地解决了周转材料的利用率过低问题,降低了成本、缩短了工期,而且施工方便。通过计算,模板拆除施工方案设计,优化及应用中发现,模板拆除时不但要计算梁板强度,而且要计算梁板的刚度,确保梁板不会因为挠度过大而产生不可修复的裂缝。 Taking the City of Lights as an example,the authors introduce the scheme design,optimization and relevant technology for formwork removal.The method proposed efficiently solved the problem of low usage ratio of revolving materials,reduced the cost,shortened the construction period,and made the construction more convenient.Through calculation,formwork removal scheme design,optimization and application practice,it was found that to prevent the beam and slab from developing excessive deflection and irreparable crack,it is necessary to check not only the strength of beams and slabs,but also their rigidity.
出处 《施工技术》 CAS 北大核心 2013年第6期41-43,共3页 Construction Technology
基金 中建股份科研项目资助(CSCEC-2011-C-04)
关键词 高层建筑 模板 拆除 设计 优化 tall buildings formworks remove design optimization
  • 相关文献

参考文献2

共引文献69

同被引文献3

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部