摘要
以阿联酋某一高层项目结构设计阶段优化设计为例,总结在D&B总承包模式下,结构优化设计的控制思路和管理流程。分别从技术设计和施工图设计两个阶段,着重论述所采取的具体措施,并结合案例分析。实践证明,高层建筑的结构优化设计,不仅使工程设计质量得以提高,而且有效地控制工程造价,并取得良好的经济效益,增强企业竞争能力,赢得市场的信心。
Taking the example of structural optimization for City of Lights project in UAE as an example,this paper summarizes the ideas and management process for structural optimization under the DB contract model.Detailed measures adopted were elaborated from both technical design stage and construction drawing stage.Practice has proved that structural optimization for high-rise building not only improved the construction quality,but also effectively controlled the project cost.This practice achieved good economic benefits,enhance the enterprise's competitiveness,and helped to win the market confidence.
出处
《施工技术》
CAS
北大核心
2013年第6期77-81,108,共6页
Construction Technology
基金
中建股份科研项目资助(CSCEC-2011-C-04)
关键词
高层建筑
结构优化设计
设计加建造
海外工程
tall buildings
structural optimization design
design & build
oversea project