广州市轨道交通6号线盾构过暗挖车站施工技术 被引量:5

Construction Technology for Shield Crossing Metro Stations with Subsurface Excavation in Guangzhou Subway Line 6
下载PDF
导出
摘要 结合广州市轨道交通6号线工程实例,开发了一种新型的盾构过站施工设备,总结了在暗挖车站狭小空间内采用新型过站小车法对盾构机整体顶升、平移、降落过站的应对措施和控制要点,形成了一套完整的盾构过暗挖车站的施工工法和关键技术,有效缩短了工期并降低了成本,具有很强的实用性。 Based on the engineering practice of Subway Line 6 in Guangzhou, a new machine for shield crossing metro stations was developed. This paper summarized construction measures and control points in the process of integral lifting, transferring and landing of the shield machine in narrow space of metro stations with subsurface excavation. With this project, a complete construction method is formed for shield crossing metro stations with subsurface excavation. This method can short the construction period and reduce the cost, which makes it widely applicable.
作者 邵翔宇
出处 《施工技术》 CAS 北大核心 2013年第7期75-79,共5页 Construction Technology
关键词 盾构 车站 整体顶升 平移 施工技术 shields stations integral jack-up translation construction
  • 相关文献

参考文献1

  • 1闻邦椿.机械设计手册(5版)[M].北京:机械工业出版社,2010.

共引文献2

同被引文献36

引证文献5

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部