摘要
本文通过粉喷桩在处理软土基中的工作原理的研究,提出了粉喷桩施工及质量控制要点。
The paper through studying working elements of powder -jetting pile imply dealing with soft soil groundsill,and bring forward the pints of the construction and quality controls.
出处
《辽宁省交通高等专科学校学报》
2000年第3期44-45,34,共3页
Journal of Liaoning Provincial College of Communications