期刊文献+

利用数学模型预测超大直径泥水平衡盾构法隧道工后沉降 被引量:1

On Using Mathematics Model to Forecast Post-construction Settlement of Super-large Diameter Slurry Balance Shield Tunneling Method
下载PDF
导出
摘要 工程建设中地表沉降是由多种原因产生的,大致可分为施工中产生的沉降和施工后产生的沉降两部分。在软土地区的隧道施工中,工后沉降占有较大比例,研究预测工后沉降具有重要的工程价值。通过实测数据与几种预测模型的比较,分析了不同模型的优缺点及其应用情况。 Ground surface settlement is appeared by several causes,and it can be divided into two parts: settlement during construction and settlement after construction.For tunnel projects in soft soil area,the post-construction settlement may possess more proportion;therefore,a study of settlement after construction has very important engineering value.By comparing some forecast mathematics models and actual data,advantages & disadvantages and application conditions of different models are researched in this paper.
作者 晁东辉
出处 《中国市政工程》 2013年第2期47-49,108,共3页 China Municipal Engineering
关键词 隧道工后沉降 泥水平衡盾构 数学模型 tunnel post-constructionsettlement slurry balance shield mathematics model
  • 相关文献

参考文献2

二级参考文献22

共引文献97

同被引文献11

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部