三塔自锚式悬索—斜拉协作体系成桥状态计算方法 被引量:1

Calculation Method of Three Towers Self-Anchored Suspension and Cable-Stayed Composite Structure in Completion State
原文传递
导出
摘要 由于自锚式悬索—斜拉协作体系桥桥型比较特殊,现有的斜拉桥和悬索桥计算合理成桥状态的方法己经不再适用,为了找寻自锚式悬索-斜拉组合结构的合理成桥状态方法,以三塔自锚式悬索-斜拉协作体系桥为例,进行了成桥状态计算方法研究,提出了协作体系的分步成桥状态法。结果表明,利用分步成桥状态法计算得到的成桥状态下的加劲梁,位于设计曲线上,并且恒载弯矩较为均匀,分布合理,符合连续协作体系的受力特点;自锚式悬索段主缆索力均匀,斜吊杆索力分布合理;斜拉段主塔弯矩较小,斜拉索索力分布均匀;分步成桥状态法可以用于三塔自锚式悬索-斜拉协作体系成桥状态的确定。 Because self-anchored suspension and cable-stayed bridge is different from traditional cablesupported bridges,the reasonable result couldn't be got according to the present available calculating methods for reasonable completion state of cable-stayed bridges and suspension bridges. Based on this principle and geometric nonlinear calculation, the step-by-step calculating method for the reasonable completion state of three towers self-anchored suspension and cable-stayed bridge is proposed on the basis of some available methods. Numerical results show that the structure loading is reasonable and this method can be used for the calculation of three towers self-anchored suspension and cable-stayed bridge.
出处 《公路》 北大核心 2013年第4期6-12,共7页 Highway
关键词 结构工程 自锚式悬索-斜拉协作体系 合理成桥状态 非线性 structure engineering self-anchored suspension and cable-stayed composite structure reasonable completion state non-linearity
  • 相关文献

参考文献3

二级参考文献27

共引文献58

同被引文献10

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部