煤层群分组上行开采相似材料模拟和数值模拟研究 被引量:1

Similar Material Simulation and Numerical Simulation of Coal Seam Grouping Ascending Mining
下载PDF
导出
摘要 通过理论分析计算,得出上下两组煤开采后的导水裂隙带发育高度以及理论破坏形态预计。通过计算机数值模拟、实验室相似材料模拟研究分析上下两组煤开采后覆岩破坏规律及顶底板应力分布规律、覆岩沉降规律,得出导水裂隙带最大值。数值模拟下煤层开采后的覆岩破坏高度,得到模拟的导水裂隙带高度,并与理论值,模拟得出的结果对比,综合分析分组上行开采覆岩破坏与运动规律。 Through the theoretical calculation and analysis, draw two groups (up and down) guide water fissure zone development height and theory of failure pattern expected after coal mining. Through the computer numerical simulation and laboratory similar material sim- ulation and analysis of the two groups strata damage rule and top floor stress distribution law after coal mining, law of overburden rock settlement, it is concluded that guide water fissure zone maximum. Numerical simulation lower coal strata damage height after mining, get simulation guide water fissure zone height, and take the results of comparative analysis with the theoretical simulation, comprehensive a- nalysis group ascending mining overlying rock destruction and motion.
出处 《煤》 2013年第4期3-5,共3页 Coal
基金 山东省科技攻关(2011GSF12010)资助 山东科技大学2012-2013年度研究生科技创新基金资助(YCB120102)
关键词 煤层群分组 上行开采 相似材料模拟 数值模拟 coal seam group ascending mining similar material simulation numerical simulation
  • 相关文献

参考文献3

二级参考文献67

  • 1姜耀东,赵毅鑫,刘文岗,李琦.深部开采中巷道底鼓问题的研究[J].岩石力学与工程学报,2004,23(14):2396-2401. 被引量:334
  • 2付国彬.巷道围岩破裂范围与位移的新研究[J].煤炭学报,1995,20(3):304-310. 被引量:80
  • 3翟新献,李化敏.深井软岩巷道围岩变形特性的研究[J].煤,1995,4(5):24-26. 被引量:12
  • 4陈建平,吴立.地下建筑工程设计与施工[M].武汉:中国地质大学出版社,2003:143-149.
  • 5钱七虎.非线性岩石力学的新进展--深部岩体力学的若干问题[A].中国岩石力学与工程学会.第八次全国岩石力学与工程学术大会论文集[C].北京:科学出版社,2004:10-17.
  • 6晏玉书.我国煤矿软岩巷道围岩控制技术现状及发展趋势[A].何满潮.中国煤矿软岩巷道支护理论与实践[C].徐州:中国矿业大学出版社,1996.1-17.
  • 7Gurtunca R G, Keynote L. Mining below 3 000 m and challenges for the South African gold mining industry[A]. In: Proceedings of Mechanics of Jointed and Fractured Rock[C]. Rotterdam: A. A.Balkema, 1998. 3 - 10.
  • 8Diering D H. Tunnels under pressure in an ultra-deep Wifwatersrand gold mine[J]. Journal of the South African Institute of Mining and Metallurgy, 2000, 100: 319-324.
  • 9Vogel M, Andrast H P. Alp transit-safety in construction as a challenge , health and safety aspects in very deep tunnel construction[J]. Tunneling and Underground Space Technology,2000, 15(4): 481-484.
  • 10Johnson R A S. Mining at ultra-depth, evaluation of alternatives[A].In: Proceedings of the 2nd North America Rock Mechanics Symposium[C]. Montreal: NARMS'96, 1996. 359 - 366.

共引文献2048

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部