摘要
文章通过对蒲石河电站1962至1993年,共计37场实测洪水过程分析,并进行各场次洪水调洪计算,比较不同回蓄方案对电站发电的影响程度,最终推荐合理的回蓄方案。
The paper analyzes the 37 flood process measured from 1961 to 1993,carries out the dispatching calculation of the every flood and compares the influence of different return water storage schemes on the power generation of power plant.Then the reasonable return water storage scheme is recommended finally.
出处
《东北水利水电》
2013年第4期6-7,9,共3页
Water Resources & Hydropower of Northeast China
关键词
抽水蓄能电站
回蓄方案
洪水调度
pumped storage power station
return water storage scheme
flood dispatching