2[8]Yuan Qincheng,Zeng Yan,Wu Yuxiao.A novel scheme for automatic loop -reconfiguration following a fault[C].POWERCON'98 1998 International Conference on Power System Technology Proceedings,August,Vol.1:18-21,1998 Beijing,China.
3[9]Yuan Qincheng,Zhang Zhonghua,He Chunxia.Study and implementation of a novel scheme for fault isolation and restoration in distribution system[C].CICED 2000,China International Conference on Electricity Distribution in 2000 Conference Proceeding,Shanghai,China,October:17-20,2000.
4[10]Yuan Qincheng,Zhou Shiyue,Bao Hongqi,et al.Practice for the distribution automation and distribution management system in China.Regional Symposium on "Electricity distribution reforms-issues and challenges in the New Millennium" the Malaysian National Committee of CIRED (MNC CIRED),August,2002,Kuala Lumpur,Malaysia:5-8.
5[11]Yuan Qincheng.Detection of single phase eearthed faults in the overhead lines of neutral floating distribution systems[C].FEISEAP Regional Workshop on PURAL ELECTRIFICATION,Sep.,1993,Beijing,China:14-17.
6[12]Final Report of The CIRED Working Group WG03.Fault management in electrical distribution systems[C].International Conference on Electricity Distribution,December 1998.
7[13]Yuan Qincheng,Wang Tianhua,He Chunxia.Research and implementation of an automated fault locating system for distribution system[C].CICED 2000,China International Conference on Electricity Distribution in 2000 Conference Proceeding,October,2000,Shanghai,China:17-20.