摘要
为准确获得大结构参数下的最优崩矿步距,以梅山铁矿为工程背景,联合应用相似材料试验方法和PFC2D软件数值模拟方法,开展18 m×20 m结构参数下崩矿步距的优化研究。基于相似材料试验,绘制出该结构参数下的放出体形态,并结合崩矿步距与矿石损失贫化的数学模型,计算得到该结构参数下的最优放矿步距为6.12 m。利用PFC2D软件对放矿步距为4.5,5.0,5.5,6.0,6.5 m共5种方案进行数值模拟研究,计算结果表明,当放矿步距为6.0 m时,矿石的回收指标最优。将相似材料试验和计算机数值模拟所得结果进行对比分析,并考虑最优崩矿步距与最优放矿步距之间的关系,最终确定该矿山在18 m×20 m结构参数下的最优崩矿步距为4.4 m。将该结果与梅山铁矿现场工业试验结果相对比,验证了该结果的正确性。
In order to get exactly optimal rate of advance during ore breaking under large structural parameters,with the background of Meishan iron mine,combining application of similar material test and PFC2D numerical simulation,the optimization of the rate of advance was discussed in this structural parameters of 18 m×20 m.Based on similar material test,the draw body morphology characteristics were drawn under the structural parameters,and combined the mathematical model of the rate of advance during ore breaking and ore loss and dilution,worked out the optimal drawing pace is 6.12 m under the structural parameters.Five kinds of drawing pace schemes about 4.5,5.0,5.5,6.0,6.5 m,were analyzed using PFC2D.The results show that when the drawing pace is 6 m,the ore recovery index is optimal.Compared the result of laboratory drawing test and numerical simulation of drawing,and considered the relationship between the rate of advance during ore breaking and drawing pace,ultimately determine the rate of advance during ore breaking under 18 m×20 m structural parameters of the iron mine is 4.4 m.Contrasting this with the result of industrial test in Meishan iron mine,the conclusion of this paper is proper.
出处
《岩石力学与工程学报》
EI
CAS
CSCD
北大核心
2013年第4期754-759,共6页
Chinese Journal of Rock Mechanics and Engineering
基金
国家自然科学基金资助项目(51274055,51204031)
湖南科技大学煤矿安全开采技术湖南省重点实验室开放基金项目(201106)
关键词
采矿工程
无底柱分段崩落法
崩矿步距
相似材料试验
回贫差
mining engineering
non-pillar sublevel caving method
rate of advance during ore breaking
similar material test
ratio difference between the recovery and dilution