期刊文献+

水电工程移民安置建设费概算编制有关问题探讨 被引量:2

Discussion on some issues about construction budget compilation of resettlement of hydropower project
下载PDF
导出
摘要 移民安置建设费用概算编制是水电工程建设征地移民安置规划设计阶段概估算的一个重要组成部分。由于农村居民点和迁建城集镇场内基础设施涉及专业多、面广,与专业项目之间有联系和交叉,使概算编制具有一定复杂性。以《水电工程建设征地移民安置补偿费用概(估)算编制规范》为基础,对项目划分及分界、计价定额运用、材料预算价格取定、取费标准、基础设施建设单价编制及动态管理等进行了探讨,以期使建设征地移民安置补偿费用概算编制更趋合理。 Construction budget compilation for resettlement is an important component of investment estimation of resettlement plan and design in land acquisition and resettlement of hydropower project. Due to the involvement of multi - specialties and wide ranges, while being closely related to public facilities, the budget compilation is complicated. On the basis of Specifications for Compilation of Cost Estimation (or evaluation) for Land Requisition and Resident Relocation of Hydroelectric Project , we dis- cussed some technical issues, such as project division and boundary, use of valuation quota, material estimation price determina- tion, charge standard, unit price compilation of infrastructure construction and dynamic management etc. , so as to make the compilation of budget for resettlement more reasonable.
出处 《人民长江》 北大核心 2013年第7期104-107,共4页 Yangtze River
关键词 移民安置 基础设施 建设费用 概算 resettlement infrastruetural construction construction cost budget
  • 相关文献

同被引文献3

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部