期刊文献+

月岭水库除险加固工程设计阶段造价控制 被引量:1

Cost Control of Yueling Reservoir Reinforcement Project in Design Stage
下载PDF
导出
摘要 建德市月岭水库由于受当时的建设标准和施工水平限制,设计、施工均存在一些问题,存在着较大的安全隐患,影响水库的正常运行.通过分析该水库除险加固工程施工阶段的主要设计变更内容,总结了水库除险加固工程设计阶段工程造价控制存在的主要问题及应采取的措施.设计阶段工程造价的控制需要项目参与各方的主动参与,应推行设计招标和限额设计,采取合理的激励措施,加强设计单位造价控制的主动性,提高建设项目的投资效益. The construction cost is one of the key guideposts in the hydraulic construction projects, and the design stage control has played a very important role. In this paper, the cost control of Yueling Reservoir Reinforcement Project in de- sign stage has been discussed, including the effect of design biddings, quota design, and design changes. It's necessary for all parties to actively participate in the cost control, in order to improve the initiative of control cost.
出处 《浙江水利水电专科学校学报》 2013年第1期23-25,共3页 Journal of Zhejiang Water Conservancy and Hydropower College
关键词 水库除险加固 造价控制 限额设计 设计变更 water reservoir reinforcement project cost control quota design design change.
  • 相关文献

参考文献5

二级参考文献12

共引文献26

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部