摘要
为了提高建筑结构在大震作用下的抗倒塌能力,对建筑结构增设赘余斜拉杆来增加结构受力赘余度和抗震储备能力,提高第二道防线的抗震能力,继而提高结构体系在大震下的抗倒塌能力。为得到增设赘余斜拉杆后的建筑结构在罕遇地震下的弹塑性响应,对单质点结构体系增设赘余斜拉杆,进行罕遇地震作用下的弹塑性时程分析,研究赘余斜拉杆发挥作用的不同条件以及斜拉杆的刚度取值范围。分析研究结果表明:对于基本周期T=0.6 s和T=0.8 s的建筑结构增设的赘余斜拉杆发挥作用的时间越早,赘余斜拉杆刚度越大对于限制最大相对位移的效果越好。
In order to improve the ability of anti-collapse of the structure under mega earthquake,this paper describes that add redundant oblique rod to the building structure increasing the degree of redundancy of structural force and seismic reserve capacity,improve the seismic capacity of the second line of defense,thus improving the ability of anti-collapse of structural system under mega earthquake.Building structure has added redundant oblique rod,in order to get elastic-plastic response of rare earthquake that creat a single-particle structure system to add redundant oblique rod,then do nonlinear time history analysis under the rare earthquake.Research redundant oblique rod play a role of different conditions and oblique rod stiffness range.Analysis results show that:for the basic cycle T=0.6 s and T= 0.8 s of the building structure add redundant oblique rod,the earlier play a role of oblique rod,the greater stiffness of oblique rod is,the bettter effect of limiting the maximum relative displacement is.
出处
《四川建筑科学研究》
2013年第2期49-53,共5页
Sichuan Building Science
关键词
抗震加固
抗倒塌能力
赘余斜拉杆
弹塑性时程分析
seismic reinforcement
ability of anti-collapse
redundant oblique rod
nonlinear time history analysis