对复杂岩溶地质条件下灌桩时易出现的几个问题的探讨与对策

Several Problems and Countermeasures in Filling Piles in Karst Geological Condition
下载PDF
导出
摘要 湘桂铁路三街漓江双线特大桥桥区地质条件复杂、岩溶发育,桩基础施工过程中出现各类问题。为确保工程顺利进行,同时降低了施工风险,依据问题提出了具体的施工对策。根据水下灌注桩施工原理,利用多次封"底"技术措施,解决因溶洞造成混凝土面下降导致断桩问题;利用连通器的原理,解决串孔施工问题。该桥施工中出现的这类问题的7根桩施工完成后经第三方超声波检测均为Ⅰ类桩。 As a result of complex geological conditions and Karst development in Xianggui Railway Sanjie-Lijiang Two-lane Large Bridge Area, there are many problems in the construction process. To ensure project is carried out smoothly and to control construction risk, corresponding detail countermeasures are put foreword in the paper. According to construction principals of underwater pile, Repeatedly Seal "the Bottom" technology is used to solve Broken Pile caused by karst concrete sinking. String holes construction is solved through connected device principal. Seven piles of the bridge are tested as A class piles through superwave detect After the construction.
作者 张兴宏
出处 《工程建设与设计》 2013年第4期161-162,165,共3页 Construction & Design for Engineering
关键词 岩溶 桩基础 灌注 串孔 karst pile foundation pcrfusion pofforation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部