通过江苏南京定林寺斜塔成功纠偏及地基加固工程,使原来的最大倾斜度7°59'纠偏至5°36',纠偏角度为2°23',仍保持了世界上现存第一斜塔的要求。该工程主要采用"塔式古建筑组合控制纠偏技术",为砖石古塔的加固纠偏及保护提供了新的思路。
The authors depicted the successful case of deviation correction and foundation consolidation for the leaning tower in Dinglin Temple in Nanjing, rectified the original maximum inclination of 7°59′ to be 5 °36′, with a deviation angle of 2°23′, keeping the tower the world's first leaning tower existing at present. The combination control rectification technology for ancient tower building was adopted in the project and the method provided new trains of thoughts for the deviation correction and foundation consolidation and protection for ancient towers made of bricks and stones.