摘要
本文介绍了核电站抗震设计要求、在建和运行核电站的抗震设计情况以及运行核电站遭遇地震灾害的情况,简述了福岛核事故后世界各国核电站在抗震方面采取的措施,针对中国广东核电集团在福岛核事故后的行动进行了详细介绍,并提出了新建核电厂在抗震设计和评估方面的策略,以期通过技术手段持续提升核电站的抗震能力。
This paper introduced the seismic design requirements of nuclear power plant, the seismic design situation of the unit in construction or in service, and the serious consequence impacted by earthquake. Then, it described in brief the measures on seismic analysis taken by countries who own nuclear power plants in the world after the Fukushima nuclear accident, and gave a particular introduction about the improvement taken by China Guangdong Nuclear Power Holding Co. Ltd. Finally, this paper presented some steps for the new nuclear power plants at the seismic design and evaluation to enhance the seismic capacity of nuclear power plants through technical means.
出处
《中国工程科学》
北大核心
2013年第4期46-51,共6页
Strategic Study of CAE
关键词
抗震设计基准
超设计基准地震
抗震裕量分析(SMA)
隔震
seismic design basis
beyond design basis earthquake
seismic margin assessment(SMA)
seismic isolation