摘要
介绍厦深铁路长沙湾特大桥栈桥检算的指标选择及验算过程,结果表明长沙湾特大桥栈桥设计安全系数符合要求,结构安全;并叙述栈桥施工的工艺流程及时间安排,以实际的工程案例为国内特大桥栈桥检算及施工提供技术参考和支持。
In this paper, the indicator selection and checking process of the calculation of the Cheung Sha Wan trestle in Xiamen-Shenzhen Railway Bridge are introduced. The results showed that the design safety factor of Cheung Sha Wan Bridge trestle meets the requirements, the structure is safe. The constructional process and schedule of the trestle is also described, which will provide technical reference and support for the check-calculation and construction of the super bridge trestle in China.
出处
《石家庄铁路职业技术学院学报》
2013年第1期57-61,共5页
Journal of Shijiazhuang Institute of Railway Technology
关键词
长沙湾
特大桥
栈桥
检算
施工
Cheung sha Wan super bridge trestle check-calculation construction