摘要
在总结地下电站施工经验的基础上,针对三峡工程地下洞室开挖难度大,施工工序复杂的特点,对洞室开挖技术进行了相应的创新和改进。研究成果可为大型洞室工程开挖提供经验和参考。
Based on the summarization on experiences from the construction of underground hydropower station, the relevant innovations and improvements are made for the technologies for excavation of cavern in accordance with the characteristics of the construction of the underground cavern of Three Gorges Project such as large excavation difficulty, complicated construc- tion process, etc. The study achievement can provide some experiences and references for the excavation of large-sized cav- ern project.