摘要
结合城市污水工程管道过河施工的实例,阐述了围堰施工、沉管施工、顶管施工三种不同的施工方法,对其施工工艺进行了分析对比,针对本工程的具体情况,最终确定采用顶管工艺施工,以满足施工要求。
Combining with the construction and example for the pipeline crossing rivers in urban sewage projects,the paper illustrates three different construction methods,that is,cofferdam construction,the sinking pipeline construction and pipe-jacking construction,analyzes and compares its construction craft,and adopts the pipe-jacking craft finally according to the factual circumstance for the project,so as to meet the engineering demands.
出处
《山西建筑》
2013年第11期104-106,共3页
Shanxi Architecture
关键词
过河管道
围堰
沉管
顶管
pipeline crossing rivers
cofferdam
sinking pipeline
pipe-jacking