期刊文献+

悬臂施工周期对PC连续梁桥成桥后徐变效应的影响分析

悬臂施工周期对PC连续梁桥成桥后徐变效应的影响分析
下载PDF
导出
摘要 PC连续梁桥常采用悬臂浇注的方法施工。由于受各种因素的影响,使其节段施工的周期会存在一定差异,从而影响成桥后梁体的徐变效应。本文结合一座铁路连续梁桥的施工过程,通过有限元建模分析探讨了悬臂施工节段的施工周期对连续梁桥成桥后徐变效应的影响,得出对于连续梁施工具有参考意义的几点结论。 Prestressed concrete continuous beam bridge often adopt cantilever casting method. As the result of many factors, the segmental construction cycle will be difference, thus affecting the bridge girder creep effect. Combination of two railway continuous beam bridge construction process, through the finite element modeling of cantilever segmental construction of continuous beam with different construction period analysis creep effect after the bridge finished, then some meaningful conclusions for the construction of continuous beam are drawn.
出处 《科技信息》 2013年第5期64-65,共2页 Science & Technology Information
关键词 连续梁桥 悬臂施工 施工周期 徐变效应 Continuous beam bridge Cantilever construction Cycle Creep
  • 相关文献

参考文献2

二级参考文献6

  • 1周履,收缩徐变,1994年,294页
  • 2范立础,桥梁工程.上,1993年,206页
  • 3朱伯芳,水利学报,1985年,3期
  • 4朱伯龙,钢筋混凝土的非线性分析,1985年
  • 5李承木,水电科学研究,1984年,2期
  • 6周远镛,重庆交通学院学报,1984年,2期

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部