摘要
结合2套42000Nm3/h空分装置冷箱内配管安装过程控制的经验,总结了空分冷箱内配管在管道预制、安装、清洗脱脂、焊接安装等过程控制要点和注意事项。
Combinate the experience of piping installation in cold box of two 42000Nm3/h air separation units. The control key points and precautions of piping pre-fabrication, clean & degreasing, welding installation of piping installation inside air separation cold box are summarized.