4Gen, M., Cheng, R. Genetic Algorithms & Engineering Design [M]. New York : Wiley, 1997.
5Ettl, M. A supply network model with base-stock control and servics requirement[ J]. Operations Research, 2000,48 (2) :216 - 232.
6汪文.随机规划与模糊规划[M].北京:清华大学出版社,1998.
7凯尔·布鲁斯.C++编程思想[M].北京:机械工业出版社,2005.
8Ellaram,L. M. Supplier selection decision in strategic partnership[J]. Purchasing Material Mnagement, 1990,16(4):8- 14.
9Federgruen A, Tzur M. A simple forward algorithm to solve general dynamic lot sizing models with n periods in 0 (n log n) or 0 (n) time [J]. Manag Sci, 1991, 37:909-925.
10Chen X, Zhang J. A stochastic programming duality approach to inventory centralization games [EB/OL]. http://archive, nyu. edu/handle/2451/26281.