摘要
通过对已完工的拉西瓦水电站左、右深孔有压段钢衬结构特点、拼装、运输、安装与焊接工艺的介绍,对泄洪孔有压段钢衬安装过程中的施工经验进行了总结。
through introduction to the structural features, assembly, transport, installation and welding technology of the steel liners at pressure section of both left and right bottom outlets, Laxiwa Hydropower Station, experience on construction of installation of the steel liners at the pressure sections of bottom outlets is summarized.
出处
《西北水电》
2013年第2期41-45,共5页
Northwest Hydropower
关键词
拉西瓦水电站
深孔
有压段
钢衬
安装
Laxiwa Hydropower Station
bottom outlet
pressure section
steel liner
installation