摘要 结合220kV忻义线116号中相横担侧挂点处金具在大风作用下发生的断裂故障情况,通过金具破坏试验、金具受力计算等手段,从金具本体、连接方式、运行环境等方面细致分析了220kV忻义线116号金具断裂原因,并提出了改变金具连接方式、强风区杆塔采用加强型金具、加强日常运行检查等针对性预防措施。 This article is based on the fracture fault of the 220 kV Xinyi Line No. 116 Fitting at the mesophase cross arm side hanging point due to the strong wind. Through the fitting failure test and its force calculation, this article carefully analyzes the cause for this fracture fault from the aspects of the fitting itself, the connection method and its operation environment. Then, it also proposes some preventive measures like changing the fitting connection method, using strengthened fitting in the strong wind region, and enforcing the daily operation test.
机构地区 忻州供电公司
出处 《山西电力》 2013年第2期67-69,共3页 Shanxi Electric Power
关键词 220 KV线路 金具 断裂 220 kV line fitting fracture
  • 相关文献

参考文献1

  • 1中华人民共和国国家质量监督检验检疫总局,中国国家标准化委员会.GB/T700-2006碳素结构钢[S].北京:中国标准出版社,2006:1-6.

共引文献1

同被引文献9

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部