期刊文献+

大连市交流岛净水厂一期项目工程设计方案 被引量:1

Engineering Design Plan of First -Phase Project of Jiaoliudao Water Treatment Plant of Dalian City
下载PDF
导出
摘要 为保证大连市长兴岛临港工业区用水需求,在交流岛新建6万m3/d规模的净水厂。一期工程按3万m3/d规模建设,包括常规处理、深度处理及污泥处理工程。充分考虑原水水质、气候条件等因素,并对净水工艺进行了分析和比较,设计采用了新型的斜管加强型平流沉淀池,确保出水水质达到现行国家标准《生活饮用水卫生规范》(GB 5749—2006)和《城市供水水质标准》(CJ/T 206—2005)的要求。 To guarantee water demand in Changxingdao Harbor Industrial Park, a new water treatment plant with the scale of 60,000 m3/d is to be constructed. The first phase is 30 000 m3/d including the conventional treatment, advanced treatment and sludge treatment project. The purification process is determined by raw water quality and local climate into account. A newly designed sedi- mentation tank is used to ensure drinking water quality meets the Standards for Drinking Water Quality (GB 5749---2006) and Wa- ter Quality Standards for Urban Water Supply (CJ/T 206--2005).
出处 《净水技术》 CAS 2013年第2期83-86,共4页 Water Purification Technology
基金 水体污染控制与治理科技重大专项(2012zx07403-002) "十二五"农村领域国家科技计划(2012BAJ25B02-01)
关键词 原水 低温低浊 斜管加强型 平流沉淀池 生物活性炭滤池 raw water low temperature and low turbidity enhanced inclined tubes type horizontal sedimentation tankbiological activated carbon filter (BACF)
  • 相关文献

参考文献5

二级参考文献47

共引文献55

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部