摘要 针对薛家坪提黄工程的实际情况,对取水方式、水泵选型、运行方式等进行了比选,提出了优化设计方案:针对泥沙较多的取水问题,采用沉沙池技术;在水泵选型时多尺度考虑上下级泵站流量匹配、机组备用、灌溉与工业用水结合等问题;运行方式采用单管运行,并配合蓄水池方案。该优化设计方案符合工程实际,节省了投资。 According to the situation of Xuejiaping Yellow River lifting project for irrigation and the research of pump selection ,water supply method and operational mode,this paper proposed an optimization design: build a dcsilting basin to solve the problem of high sediment concentration; for the pump selection, consider the aspect of pump station flow matching between upper and lower levels, the unit spare, irrigation and industrial combina- tion; take the design of single pipeline combined with reservoir for operational mode. The optimized design accords with the actual project and saves investment.
作者 董亮 黄伟
出处 《人民黄河》 CAS 北大核心 2013年第4期55-57,共3页 Yellow River
关键词 供水工程 水泵选型 优化设计 运行方式 薛家坪提黄工程 water supply project water pump selection optimization design operational mode Xuejiaping Yellow River lifting project for irrigation
  • 相关文献

参考文献8

二级参考文献12

  • 1水利电力部农村水利水土保持司,水利电力部水利水电规划设计院.SD204-86泵站技术规范[S].北京:水利电力出版社,1987:46-47.
  • 2陈君.中部四省为排涝泵站疗伤[N].中国水利报,2006-07-04(00A).
  • 3武汉水利电力学院.水泵及水泵站[M].北京:水利电力出版社,1984.39-43.
  • 4河北省地质局水文地质四大队.水文地质手册[R].1978.
  • 5黄洪标,袁新荣.新疆阜康大黄山中外合资焦炭厂供水大口井施工方案[R].新疆维吾尔自治区地质矿产勘查开发局第一水文地质工程地质大队,2004.
  • 6黄洪标,侯谦儒.新疆乌河管理处八一闸供水大口井施工方案[R].新疆维吾尔自治区地质矿产勘查开发局第一水文地质工程地质大队,2005.
  • 7侯谦儒,赵新民.新疆布尔津供水大口井施工方案[R].新疆维吾尔自治区地质矿产勘查开发局第一水文地质工程地质大队,2006.
  • 8侯谦儒,袁新荣.新疆巩乃斯疗养院供水大口井施工方案[R].新疆维吾尔自治区地质矿产勘查开发局第一水文地质工程地质大队,2007.
  • 9李琪,许建中,李端明.全国大型泵站更新改造前期工作有关问题探讨[J].中国农村水利水电,2007(12):41-44. 被引量:7
  • 10孙秋明,张泽良.用浮船泵站解决尊村引黄灌区水源问题的途径[J].山西水利科技,2001(4):82-83. 被引量:2